Construction is progressing steadily on the Kedmor designed Bende Idima Abam Bridge in Abia State, Nigeria.

The project involves a 45 m long bridge composed of three 15 m spans. The bridge is designed as an integral structure, offering enhanced durability and reduced maintenance requirements over its service life.

The piling phase, including drilling and casting of all piles, has been successfully completed. The contractor is currently carrying out the casting of the intermediate pier columns, while works on the pile caps are being finalized in preparation for the upcoming superstructure phase.

Kedmor Team: Micha Petri, Mor Machlev, Rachel Davidson, Alena Bichanov, Shoon Lae, Kyaw Hsu Thway, Min Khant Kyaw, Pyae Phyo Htet

Client – GELD
Project Manager – Nabeel Esawi
Road Designer – SMA
Contractor & Photo Credit – GELD