Kedmor Engineers in the annual CivilEng Race

Kedmor Engineers in the annual CivilEng Race

Kedmor Engineers runners participated in the annual CivilEng Race.

It was a well-organized sport event and a great opportunity to meet our colleague.

Well done everyone.

welcome our interns

Kedmor welcomes, Eden Lorman , Nitay Barak, Inbar Talker, Oz Hoyda from Ben-Gurion University of the Negev, for their internship.

Each will be involved with our projects, gaining valuable practical experience in the design office.

They will also receive guidance for their final university projects from our Team Leaders.

Please get in touch if you’d like to be part of next year’s student intake.

HAPPY JEWISH NEW YEAR


Happy Hebrew New Year and Happy holidays.

Wishing everyone all the best.

Kedmor Engineers.

BIA Bridge, Ghana

BIA Bridge, Ghana

The construction of the bridge is finished.
The work on the road is in progress and the bridge will remain closed to traffic until the completion of the road along its entire length.

Photos by: Amandi Invensments LImited LTD

2411 Road Ofakim

2411 Road Ofakim

Bridge #4 is a cast in-situ post tensioned bridge 25 meter long.
The bridge carries road 2411 over a desert trail.
The bridge’s superstructure was cast in one pour.

Photos by: Etgar- Engineering & Consultancy LTD

HETZEL BRIDGE

HETZEL BRIDGE

Ducts arrangement – main casting of the bridge (casting stage 1)


Pictures by : Shachar Perez

Herling Bridges

Herling Bridges

Herling Bridges, in Bnei-Brak, Israel

Reinforcement arrangement- slab stage 1

Client: Ayalon Highwsys
Contractor: Terre-Armee

Photos by: Terre-Armee

Happy New Year

We wish all of our colleagues, friends and family Happy New Year.
Welcome 2022.

Construction of Mid pier cap beam

Construction of Mid pier cap beam

The new 2411 route named Ofakim-Sde Teyman road connects the new entrance of Ofakim to the existing road No. 25 by Sde Teyman.

In the picture, mid pier 2 of BR3 over Patish river. This bridge is 80m long, 24.6m wide and has three spans of 24-32m.

The superstructure is designed with eight pre-stressed reinforced concrete beams while the top deck is cast on site.

The contractor: A.M.Z Shemesh 1990
Photos by: Gal Edri

Ibi Bridge in Nigeria

Ibi Bridge in Nigeria

Ibi Bridge project in Nigeria.

The first pile of axis 21 was drilled and cast.

The bridge is 2,450 meters long and has 28 spans.

The piles are 180 cm in diameter, cast in water using steel casing.

Contractor: RCC, Nigeria

Happy Jewish New Year

Happy Hebrew New Year and Happy holidays.

Wishing everyone health, prosperity and well-being.

Kedmor Engineers LTD.

שנה טובה תשפב.jpg

Herling Bridges

Herling Bridges

Herling Bridges, in Bnei-Brak, Israel

Client: Ayalon Highwsys
Contractor: Terre-Armee
Photos by: Mor Machlev & Roee Meidan

Public Transportation Parking Lot 4/9

Public Transportation Parking Lot 4/9

WhatsApp Image 2021-04-05 at 11.15.07.jpeg
WhatsApp Image 2021-04-07 at 14.48.14.jpeg

Assembly of post tensioned girders at “Public Transportation Parking Lot 4/9”  - Ramot Interchange, Jerusalem.

Kedmor provided Value Engineering Services for these girders, among a total number of 246, mainly used for architectural/gardening purposes.

The design incorporated full BIM process and digital 3D deliverables.  

We thank our colleagues at Yaron-Shimoni-Shacham, the Designer of Record, for a fruitful cooperation.

 

Contractor: Danya Cebus Ltd.     

Client: Moriah Jerusalem Development Corporation

Photos taken by: Gal Edri

WhatsApp Image 2021-04-07 at 14.03.00 (1).jpeg

Welcome our interns

our internship.jpg

Kedmor welcomes, Maayan Kalakuda, Omer Tsur and Ran Gotliv from Ben-Gurion University of the Negev, for their internship.

Each will be involved with our projects, gaining valuable practical experience in the design office.

They will also receive guidance for their final university projects from our Team Leaders.

Please get in touch if you’d like to be part of next year’s student intake.

Ayalon HighWays crossing road and railway tracks south of Glilot

Ayalon HighWays crossing road and railway tracks south of Glilot

20210214_150501.jpg
20210214_161621 (002).jpg

Our firm designed a set of bridges for Ayalon HW crossing road and railway tracks south of Glilot. To prevent future traffic disruptions, foundations are being constructed for the future bridge as part of the 'fast lane' project . Yesterday the first element was cast Successfully.

Project mangement: Etgarengineering, Yahel-eng
Contractor: Ashtrom
Client: AyalonHighways

Photos: Micha Petri

Kedmor 20th celebration

KEDMOR _ 20.png

While welcoming 2021, Kedmor enters its 20th year anniversary.

Throughout the year of 2021 we will use a modified logo to mark the occasion.


Happy New Year.


HAPPY NEW YEAR

We wish all of our colleagues, friends and family Happy New Year.
Welcome 2021.

שנה אזרחית.jpeg