Kedmor welcomes our new Engineers.
Gilad Tayeb and Rabia Rohana who recently joined our team.
We wish Gilad and Rabia much satisfaction and success.
Kedmor welcomes our new Engineers.
Gilad Tayeb and Rabia Rohana who recently joined our team.
We wish Gilad and Rabia much satisfaction and success.
Kick-off of foundations works at Herling Bridge site
photos: Gadish LTD
Loko Oweto Bridges – Completion of Construction
The construction of the Loko Oweto bridges across the Benue river in Nigeria was recently completed and will be open to traffic once the approach roads are finished.
The Bridges, 1,835 meter long each, were designed by Kedmor for RCC Nigeria who constructed the Bridges.
We wish to thank all of our partners and friends in RCC and SBI International and the soil consultant Israel Klar for a job well done.
The Project in local news: https://www.youtube.com/watch?v=DV4DA0OAk4A&feature=youtu.be
(Images by: arc-deco.com)
The Israeli railway electrification project is speeding up and it has reached Savidor station in the center of Tel Aviv connecting it to Navon station in Jerusalem.
Kedmor is the Structural engineer of the project working with the Spanish contractor, SEMI.
Picture: Electric locomotive @ Savidor station
(Credit: Santiago Lopez, Semi)
A railroad over-crossing bridge adjacent to a communication facility (which is the origin of the name) is located east of the city of Acre.
The bridge provides a way of access to an industrial park developed nearby.
Photos and Video:
Olenik Transportion, Earth Works& Road Construction LTD.
Design of below ground 32m diameter water silo and a variety of retaining walls along a 2.2km stretch of road.
The silo was formed of reinforced concrete and founded on piles, using top-down construction methodologies.
Contractor: K.S.M.G. LTD.
Photo: Eng. A. Kummer
As part of the continued construction of Road 423 from the bridge connecting Highway 4313 to the Begin road our office designed several structures.
Among others, this video presents the ongoing construction of the first stage including retaining and acoustic walls, an underground concrete water reservoir and more.
Enjoy!
Contractor: K.S.M.G. LTD.
Click here for viedo of the road.
Kedmor recently submitted tender documentation for Reading Station, in North Tel-Aviv, on behalf of NTA and in conjunction with Kaan Architects.
Click here to view our project page.
For the end of the year Kedmor had a day out.
We started at Hula Nature Reserve, a beautiful place.
Then we went to eat at Mitbalim restaurant in Rosh Pina.
For dessert we had a muddy Extreme RZR ride at Kalanit.
Kedmor welcomes this year’s placement students, Daniel Nave and Or Natan from Ben-Gurion University of the Negev.
Each will be involved with our projects, gaining valuable practical experience in the design office.
They will also receive guidance for their final university projects from Shimon Senior Engineer and Gal Team Leader.
Please get in touch if you’d like to be part of next year’s student intake.
Mor Machlev reported on the refurbishment of this bridge, damaged by impact loads from lorries, in Construction and Infrastructure Engineering, the magazine of the Israeli Association of Construction and Infrastructure Engineers, Issue 83, August 2019.
Read the full article in Hebrew here.
Micha Petri reported on the design and construction of this 350m long bridge, which connects Israel to Jordan, in Bridge Design & Engineering Magazine.
Read the full article here.
(C) Bridge Design & Engineering
We recently held an interesting CPD seminar at our offices, on bridge tension-cable grouting, from industry expert Alex Poliakov.
He presented examples of grouting and tension-cable failure from around the world and advised on best-practice methods, to mitigate these issues.
Thank you, Alex!
Check out our new page on Instagram!
We’ve compiled some of our best project-photos and images, into one place.
Feel free to follow, ‘like’ and share.
Kedmor recently submitted tender documentation for this pair of curved, post-tensioned bridges at Zeitim Interchange, Jerusalem.
This was our first project, where we implemented the new Sofistik parametric bridge modelling software in our BIM model.
Click here to find out more about this project.
We are delighted to announce the promotion of Robert Ferris to Director of UK Projects.
Robert moved from London to Israel with his family in 2017. He is a Chartered Structural Engineer with a wealth of experience working alongside leading Architects and Developers, on building projects within the UK.
We are keen to use his local knowledge to help our clients to design great buildings, both in the UK and in Israel.
We are thrilled to announce that Kedmor have been awarded a Certificate of Excellence, for outstanding achievement as a nominee, at the Bentley Infrastructure Awards 2018, for our Loko Oweto Bridges project in Nigeria.
Further information on this project can be found here.
2018 Infrastructure Yearbook
Image courtesy: Bentley Systems
We presented papers at two conferences in Guimaraes, Portugal last month.
The first, was the final conference of the TU1406 COST Action Group. This is a part of a special study programme, funded by the EU, with the objective of encouraging collaboration between academics and practical designers. Amir Kedar has acted as Moderator for Study Panel 6, which presented papers and case-studies of how the quality control of existing bridges is performed outside Europe.
The second was the IABSE Symposium 2019, where Micha Petri presented his paper on the design of the Loko Oweto Bridge in Nigeria and Amir presented his work with the Cost Action Group.